News Center
220kv Converter Station leak testing

220kv Converter Station leak testing

Testing engine blocks, transmission cases, oil pans, aluminum wheels and other large automotive castings can be challenging. For instance, a bare engine block can be more than 2 feet long and weigh more than 85 pounds. Leak testing big parts is not as easy as it is for smaller components, such as fluid reservoirs, air filters or gas caps. Cycle time and accuracy are challenges, mainly due to ...

[email protected]
News Detail
  • The study of 220kV power substation (equipment details) | EEP

    2021-3-7Until 2007 it was transmitting 66KV energy and on 29 July 2008 it was up graded to 220KV substation.. Specification of used transformer. At Passiana substation transformers manufactured by B.H.E.L, A.B.B, T.A and E.C.E are installed with their power ratings ranging from 20 MVA for 66/11KV to 100MVA for 220/66KV step down voltages.. The main purpose of these transformers is to step down

    Get Price
  • Leak Rate Units - Leak Test Systems | Leak Testing

    The leak test industry in the U.S. has standardized on stating leak rates in units of “scc/m” or “scc/s” (atm cc/s) – standard cubic centimeters per minute or second. European industry uses “Pa-m3 /s” or “mbarl/s.” These are the SI gas leakage rate units defined in the Nondestructive Testing Handbook, Second Edition.

    Get Price
  • Tower Testing and RD | Kalpataru Power Transmission

    KPTL set up its own Tower Testing Station and RD Centre near Gandhinagar using innovation in design and construction with the latest facility. It has capacity of testing of testing up to 800 KV of Double Circuit Tower and 1200 KV of Single Circuit Tower, with 30×30 meters of base width and 85 meters of height.

    Get Price
  • Leak Testing Large Castings | 2012-05-01 | Assembly Magazine

    Testing engine blocks, transmission cases, oil pans, aluminum wheels and other large automotive castings can be challenging. For instance, a bare engine block can be more than 2 feet long and weigh more than 85 pounds. Leak testing big parts is not as easy as it is for smaller components, such as fluid reservoirs, air filters or gas caps. Cycle time and accuracy are challenges, mainly due to

    Get Price
  • Tobias Tjimbandi Pr.Eng - Member / Principal Engineer

    Involved with the installation and testing of the new 220kV Khan Sub Station. Involved with the testing and commissioning of the Omburu Sub Station Bus-Zone. Part of the testing team that did the Doble Insulation and Sweep Frequency Response Analysis tests of the City of Windhoek’s; Goreangab, Kupferberg and Olympia Load centres.Title: Member / Principal Engineer

    Get Price
  • NATIONAL TRANSMISSION DESPATCH COMPANY

    220kV T/L for Chakdara Grid Station (70 km) 16-09-2018: Evacuation: 7: Reconductoring of 220kV Tarbela - Burhan D/C T/Line Circuit 12: 28-02-2019: Evacuation: 132 kV Transmission Lines : 8: 17 MW Ranolia HPP 132kV T/Line (1.5 km) 08-05-2017: Evacuation: Extension/Augmentation Works : 9: Augmentation of 2x160MVA Transformer with 2x250MVA at

    Get Price
  • DMRC ELECTRICAL STANDARDS DESIGN WING (DESDW)

    2017-11-30This specification defines the objectives, guidelines and requirements for Supply, laying, testing and commissioning of Extra High Voltage Cables (220/132/110/66kV) from the Receiving Substations of Power Supply Authorities to the Receiving Substations of DMRC.

    Get Price
  • Construction of New Substation Akhaltsikhe 500/400/220 kV

    Construction of New Substation Akhaltsikhe 500/400/220 kV and DC Converter Station . Project name: Black Sea Transmission Network (BSTN) Project (245.5 million). Donor organizations: KfW, EBRD, EIB, EC NIF. Contractor: SIEMENS (Austria)- substation;SIEMENS(Germany)– converter station. Total price of the project (loan) : 38.3 million EUR – substation; 141.3 million EUR – direct current

    Get Price
  • HIPOT TESTING 101 - Electrical Safety Testing

    2018-6-7500 VA Hipot Testing Adoption of Exceptions Keep your eyes open for new versions of standards –many of adding this exception to the 500VA requirement Some standards include exceptions to a 500VA hipot requirement UL 1598 –Luminaires –Clause 19.20 : “If the output of the test equipment is less than 500VA, the equipment shall

    Get Price
  • Transformer Installation, Assembly Testing

    2019-2-13processing, testing of transformer •Adherence to manufacturer’s or industry protocols for assembly, processing, testing •Acceptable test methods and results •Adequate records 2019-02-11 / 2019-02-12 W.J. (Bill) Bergman, IEEE - Calgary / Edmonton 29

edge-iconRelated News
toTop
Click avatar to contact us
Chat Online